Customer Support +8613731696997

Press Release 2: Technological Breakthrough

Breaking the Difficulty of High-altitude Maintenance! The world's first magnetic climbing crane goes into production


Innovation highlights

> Pain point solution

> Wind power/chemical tower tank maintenance has long existed:

> Traditional scaffolding construction takes more than 3 days

> The swing of the hanging basket operation affects the accuracy

> Safety risk level reaches SIL3


> Subversive solution

> ▶ Permanent magnetic adsorption chassis: vertical facade load-bearing 1.5t without falling off (12-level strong wind test passed)

> ▶ Bionic joint robot arm: 360° omnidirectional operation, positioning accuracy ±0.5mm

> ▶ Triple safety protection:

> - Redundant adsorption system automatically replenishes magnetism

> - Millimeter wave radar anti-collision

> - Real-time warning of overturning moment


> Application prospects

> Orders have been received from the world's top 3 wind power operators, and the first batch of equipment will be used for the maintenance of 90-meter offshore wind turbine blades in the North Sea